ADVERTISEMENT

Delhi Metro's Central Secretariat-Qutab Minar corridor to start on Sep 3


The Central Secretariat – Qutab Minar underground corridor of the Delhi Metro will be inaugurated by Union Urban Development Minister S Jaipal Reddy in the presence of Delhi Chief Minister Sheila Dikshit on September 3.


Mr Reddy will flag off the ceremonial train on the occasion from the Udyog Bhavan station at 1 pm on that day. The section will be opened for the public from 3 pm of the same day, when commercial operations will commence.


A press release from the Delhi Metro Rail Corporation (DMRC) said Mr R K Kardam, the Commissioner for Metro Rail Safety (CMRS), had completed his inspection of the corridor today and a formal clearance was expected shortly.


The 12.53 kilometre long corridor has nine underground stations - Udyog Bhawan, Race Course, Jor Bagh, INA, AIIMS, Green Park, Hauz Khas, Malviya Nagar and Saket - and one elevated station, Qutab Minar.



With the opening of this line, the total length of the Jahangirpuri – Gurgaon HUDA City Centre corridor will become 45 kilometres which will be covered in about one hour and 20 minutes. It will cost Rs. 29 for a passenger to travel from HUDA City Centre to Jahangirpuri.



The total operational Metro network will thus become 138 kilometres with 117 stations from that date, the release added.


NNN

© Copyright 2011 NetIndian. All rights reserved. Republication or redistribution of NetIndian content, including by framing or similar means, is expressly prohibited without the prior written consent of NetIndian Media Corporation. Write to info[AT]netindian[DOT]in for permission to use content. Read detailed Terms of Use.